Building and Grounds Committee Agenda
May 20 , 2005 from 9:00 a.m.-11:0 a.m. - Purchasing Bid Rm.
May 20 , 2005 from 9:00 a.m.-11:0 a.m. - Purchasing Bid Rm.
- FY06 Capital Budgets (L. Aronson, B.DeTora, G.Kraus)
Decisions: May 13, 2005 Meeting
- The CUE temperatures have been fixed - $20K.
For Future Meetings:
Hanging Items (for future meetings):
- Master Plan Delivery Access (JJR to do map) – site Rec II before we can do
- 21st Century UConn – Equipment, Library Collections & Telecommunications: need to establish outcomes goals, revenue strategies and budget need. Need plan to wean us from dependence on bond funds.
- Generic Lab Design – teaching labs, to commence, need for Torrey; Torrey Design Review – lab review. (George/Ross/Janet) Synchronize with Torrey.
- Written Report One-Card: Reconstitute one-card group – TBA (John) Should we fold into security study?
- Common Clinic Building (D.Dreyfuss/R.McKinnon/L.Aronson to come up with plan)
- Meeting with Provost's Clinic Building Working Group – January (D.Dreyfuss/R.McKinnon/L.Aronson) Are we building a clinic or not?
- Stamford Parking Garage – to be part of multi-year plan ® (G. Kraus)
- Depot Campus Draft Plan (J. Greger) Hold, pending additional funding plan.
- Work on Fairfield Way access with Public Safety (K Fox/J. Saddlemire/D. Dreyfuss) To be implemented spring and summer.
- Arjona/Monteith options 1E and 2C presented by architects to be examined in full and report back to B&G.
- Honors Program Complex – estimated $5M, will site when donor identified (South Campus completion) – Indefinite hold.
- Review priorities plan and project schedule.®
- The Agronomy Greenhouse. J. Greger and K. Kerr will pay for demolition of condemned structure at the Agronomy Farm. G. Kraus to acquire new kit to be erected by manufacturer using '06 DM funds (accessed as of 7/1/2005).
- J. Greger to discuss with K. Kerr outlined option for providing needed space to 2 PIs of Center for Regenerative Biology.
- Ballard Puppetry – G. Kraus to prepare single floor estimate and report back to B&G.®
- Rooms at Grad School need to be freed up. D. Dreyfuss to discuss UCAELI classroom space with Dolan Evanovich/Registrar.
- D. Dreyfuss will look into re-structuring of scaffolding that surrounds the Wilbur Cross Building to facilitate easier access to the building.
- D. Dreyfuss to investigate cost of pouring a concrete floor in Ratcliffe Hicks Building arena to facilitate use for student activities. Floor will need to be drained and have ability to have drains capped (to avoid clogging) when animals and their feed/bedding are occupying the space.
- L. Flaherty-Goldsmith informed B&G Committee, in order to keep University's IT infrastructure moving forward, $3.2 million in funds will be necessary for next fiscal year – to come from the equipment line currently allocated $4.1 million for next fiscal year. To act on this request, B&G needs understanding of current existing commitments to Deans/faculty start-ups, unspent equipment balances (that are not already committed) and criticality of the IT plan components. C. Faustman will call a sub-committee meeting in mid-to-late- April to resolve this issue.
- Three options for potential placement of a Student Recreation Facility requiring 5 acres for building structure in addition to space for fields/parking, were discussed. G. Kraus/K. Fox to ask Master Planners to rework Master Plan to accommodate a facility of this type following Options B & C. Option A is unacceptable because of necessity to use Rte 195 for access and loss of productive agricultural land.®
- D. Dreyfuss to discuss possible kiosks for student postings with John Saddlemire and report back to B&G.®
- The cost to run power to operate the composting facility is approximately $60K - $65K. R. Miller to review and report back to B&G.®
- D. Dreyfuss to keep B&G posted as to developments with regard to the golf course.
- Follow-up to hall dorm discussions. To be revisited when Provost is ready. ® (Cameron)
- Upgrading the campus alarm system(s). L. Flaherty-Goldsmith to head sub-committee to address within the context of a total campus facilities infrastructure plan. To be discussed by B&G in the fall.®
® – Revisited from earlier meeting